Architectural Projects


Scairono Martinez Architects specializes in roof replacements. Ron Martinez is a member of the Roof Consultants Institute. He has completed over 33 projects involving roof replacements for a total construction cost of approximately 6.9 million dollars.

Learn More...

Programming through Construction Administration Construction Cost – $165,000 This outdoor learning area at Fannie C. Williams School includes a one teaching pavilion, planter boxes, and two storage areas.

Learn More...

Design and Construction Administration Construction Cost: Estimated $5,986,984 This two story 31,000 S.F. building features a Wells Process Equipment Instructional Lab with four (4) training lines and a Control Room Simulator.  The training facility also includes classrooms, offices, a Pump/Tank Room, and support spaces for training deepwater production crews.

Learn More...

Investigative demolition and renovation of a Historic 1917 two story structure and annex Building. Upgrade Mechanical, Electrical and Plumbing while protecting historic features. New additions at interior courtyard area.

Learn More...

The Lobby, Bar area, and 23,900 S.F. of existing ballrooms and meeting rooms were redesigned and renovated in this downtown hotel.

Learn More...

A New 2,945 S.F. office building with four offices for the principals of the firm. It also included the reception area and two conference rooms.

Learn More...

A New 31,152 S.F. Fixed Base Operator Facility including 19,600 S.F. of Hanger space at the Lakefront Airport.

Learn More...

Fifty (50) new units of affordable housing for the elderly. This facility included a Multi-Purpose Room and an outdoor seating area.

Learn More...

Scairono Martinez Architects and Regal Construction, LLC designed and constructed 3 new buildings that lie within yards of the main processing components of the plant. These buildings were designed as durable, low maintenance buildings using Nucor steel for as many building products and components as possible. This project was awarded the 2013 ABC Excellence in Construction Award.

Learn More...

A new facility with a 32,000 S.F. Readiness Center, a 3,500 S.F. Maintenance Training Bay Building, and a 560 S.F. Flammable and Controlled Substance Storage Building. 

Learn More...